SC 773
< SC 772 | Home SC 774 >
From: (Newberry County)
To: Pomaria (Newberry County)
Total Length: 5.5 miles  
ROUTE LOG
US 76: 0 - 0
I-26 (exit 82): 2.1 - 2.1
US 176: 3.4 - 5.5
Creation: SC 773 appeared in 1942 running from US 76/SC 2 near Prosperity east through Pomaria to end at SC 329 (now S-40-28). SC 773 had a brief overlay with SC 177 (now S-40-107). This is the only SC 773.
Adjustments: In 1947, SC 773 was downgraded to S-40-32 west of Pomaria and S-40-33 east of Pomaria.
In 1950, SC 773 was resurrected from US 76 to SC 177 (now US 176) Pomaria.

1942 Official
SC 773 initial routing
1942 Official
1947 Official
SC 773 decommissioned
1947 Official
1950 Official
SC 773 returns west of Pomaria
1950 Official

Improvements: The part east of Pomaria was paved in 1942; the rest was paved when resurrected in 1950; no multilane segments.
Comment: SC 773 is the best method to get from I-26 to Prosperity. Also, the second largest Jockey Lot in SC is at the exit.


Previous: SC 772  |  Next: SC 774
Top  |  South Carolina Hwy Index Home

Page last modified 12 April 2015