SC 930  not currently assigned
Previous SC 930's:

1943 ROUTE LOG
BEGIN SC 930: 0 - 0
SC 97: 3.9 - 3.9
SC 93: 2.5 - 6.4
SC 930: Appeared in 1940 as new primary routing, running from SC 97 to SC 93 (now SC 200) east of Great Falls.
In 1942, SC 930 was exended south as new primary routing to the Rock Creek/Cedar Creek Power Plants on the Catawba River.
In late 1947, SC 930 was downgraded to S-29-40 south of SC 97 and S-29-20 north of SC 97. Today all 6.4 miles of it is S-29-20.

1940 Official
SC 930 as a cutoff between SC 93 and SC 97
1940 Official
1942 Official
SC 930 extended south to the Catawba River
1942 Official

 