The Highways of North Carolina
I-885 
< 79 | Home | 85 | 85 Bus | 85 TEMP | 185 | 285 | 485 | 785 | 95 >
I-885  Pre-requested
Futurely: I-885 appeared in August 2014 when NCDOT released the signing plans for the East End Connector southeast of Durham (thanks to Bob Malme).
I-885 would begin at the I-40/NC 147 interchange, follow NC 147 north, then use the East End Connector over to US 70, then follow US 70 west to I-85 EXIT 178.
The East End Connector is supposed to begin construction in late 2014. This road has been a dotted line on Durham County maps back to at east 1962!

Last Update: 10 October 2014

Previous: I-79  |  Next: 85 | 85 Bus | 85 TEMP | 185 | 285 | 485 | 785 | 95 >
Top  |  NCRoads.com Home ------------------------------------------------